Hopper for a digestion tower renovation in Siegen Germany
Project details
- Customer: W. Hundhausen Bauunternehmung GmbH
- Building owner: ESI Entsorgungsbetrieb der Stadt Siegen
- Construction time RSB: September 2022
- Volume: –
- Dimensions:
- Funnel: 45° angle
- 2,2m diameter bottom
- 15,9m diameter top
- 8,1m height
- Special features: The old digester was technically not ok anymore, that´s why the funnel was made new. The challange was to bring all the material through a small 90cm-manhole in and out. Also concrete was installed in the closed digester.