Tunnel U2 Vienna Austria

Tunnel formwork systems

Project details

  • Customer: Strabag
  • Building owner: Wiener Linien
  • Construction time RSB: September 2022 until December 2022
  • Trades to be supplied: Full-round formwork
  • Dimensions:
  • Block length: 10m
  • Panel weight: 50 Tons
  • Special features: The full-round formwork, produced and delivered by RSB will be assembled on an existing traveler unit. The formwork will be used to pour the standard sections of the new underground metro line. The formwork will be used to pour the standard sections of the new underground metro line.
The full-round formwork, produced and delivered by RSB will be assembled on an existing traveler unit. The formwork will be used to pour the standard sections of the new underground metro line.

Contact us

Hinweise zur Verarbeitung Ihrer Angaben

10 + 5 =

RSB Formwork Technology

Schilfweg 1 · 6972 Fußach · Austria

n

+43 (0) 5578 7960-400

Subscribe to newsletter