Brenner Base Tunnel
Tulfes Pfons
Austria
Project details
- Customer: Arge Brenner Basistunnel (Strabag/Sallini)
- Construction time RSB: September 2017 – December 2020
- Dimensions:
Arched formwork for emergency stops Main tube 15 m span
Block length L = 12,5m - Special features:
The RSB machine was designed to be able to concrete the emergency stops as well as to be transported through the exit tunnel without major dismantling work.