7 shafts
Dubai
United Arab Emirates
Project details
- Customer: PORR – Six Construct JV
- Building owner: Dubai Municipality
- Construction time RSB: May 2019 – May 2021
- Dimensions:
Cylinder CS 4: 20.4 m diameter / 45.10 m height
Cylinder CS 4-1: 13, 0m diameter / 24,58 m height
Cylinder CS 4-3: 17,0 m diameter / 22,07 m height
Cylinder DS 3: 20,4 m diameter / 46,59 m height
Cylinder ZS 4: 13,0 m diameter / 19,98 m height
Cylinder CS 3: 22,4 m diameter / 44,45 m height
Cylinder CS 5: 21,9 m diameter / 45,12 m height