Tunnel

Arch formwork

 

Biel

Switzerland

Tunnel formwork systems

Project details

  • Customer: ATUBO (Walo – PORR – Specogna)
  • Building owner: Canton of Bern
  • Construction time RSB: August 2010 – August 2011
  • Dimensions:
    Formwork length: 12,50 m
    Sformwork weight: 165 t
  • Special features:
    The RSB machine was designed to be able to concrete the emergency stops as well as to be transported through the exit tunnel without major dismantling work.
Project Tunnel arch formwork Biel - Switzerland

Contact us

Data privacy / DSGVO

5 + 12 =

RSB Formwork Technology

Schilfweg 1 · 6972 Fußach · Austria

n

+43 (0) 5578 7960-400

Subscribe to newsletter