Beggen digestion tower Luxembourg

Project details
- Customer: Tralux Construction Lux
- Building owner: Ville de Luxembourg
- Construction time RSB: December 2024 – still running
- Capacity: 5.500m³
- Dimensions:
Funnel: 44° 8.20m height
Digestion tower: 19,0m Diameter / 24.2m height
Cone roof: 44° - Special features: The extensive expansion of the Beggen wastewater treatment plant in Luxembourg includes the construction of a new large digestion tower. Beggen is already the second digester construction site for Tralux after Mamer. The large hopper is being formed in such a way that the formwork can also be used in the conical roof. The cylinder is concreted in four sections of 2.4 meters each.