Intersection formwork for shaft DS 3
Dubai
United Arab Emirates
Project details
- Customer: PORR – Six Construct JV
- Building owner: Dubai Municipality
- Construction time RSB: May 2019 – May 2021
- Dimensions:
Fullround formwork: Ø 10.0 m – length approx. 6.0 m
Shaft formwork: Ø 20.4 m – arch length 16 m – height 16 m - Special features:
The challenge was to design the formwork in such a way that the two tunnel tubes, which were not centrally opposite, could be concreted with one formwork. (Asymmetrical formwork!)