Secondary clarifier Markt Winklarn Germany

Funnel formwork systems

Project details

    • Customer: Bau Wagner
    • Owner: Gemeinde Markt Winklarn
    • Construction time RSB: June 2023 – July 2023
    • Volume:
    • CDimensions:
      Funnel: 9,00m Diameter / 6.95m height
      Zylinder: 9,60m Diameter / 2.65m height
    • Special features: The specially developed formwork solution from RSB enabled a high-quality and smooth concrete surface without visible anchor points. The jointless concreting of the hopper and cylinder wall created a particularly durable and resistant construction that meets the highest structural requirements of the municipality of Markt Winklarn.


Secondary clarifier Markt Winklarn / Germany

Contact us

Notes on the processing of your data

13 + 8 =

RSB Formwork Technology

Schilfweg 1 · 6972 Fußach · Austria

n

+43 (0) 5578 7960-400

Subscribe to newsletter