Primary clarifier Marl-West Germany

Project details
- Customer: Eiffage Infra-Nordwest GmbH
- Building owner: EGLV Lippeverband
- Construction time RSB: January 2023 – May 2023
- Capacity: 1.100 m³
- Dimensions:
Funnel: 60° 4.50m diameter at the top / 3.1m high
Pool wall: 19.00m diameter / 4.2m height - Special features: The primary sedimentation tank was built in the existing structure so that the tank wall was only constructed on one side. There is also a DN 1000 inlet pipe in the hopper, which was installed with a perfect fit.