Hopper for a digestion tower renovation in Siegen Germany

Funnel formwork systems

Project details

  • Customer: W. Hundhausen Bauunternehmung GmbH
  • Building owner: ESI Entsorgungsbetrieb der Stadt Siegen
  • Construction time RSB: September 2022
  • Volume:
  • Dimensions:
  • Funnel: 45° angle
  • 2,2m diameter bottom
  • 15,9m diameter top
  • 8,1m height
  • Special features: The old digester was technically not ok anymore, that´s why the funnel was made new. The challange was to bring all the material through a small 90cm-manhole in and out. Also concrete was installed in the closed digester.