Stuttgart Airport Tunnel Germany

Project details
- Customer: ARGE Flughafentunnel Stuttgart (Züblin | Max Bögl)
- Owner: Deutsche Bahn
- Construction time RSB: Main service April 2021 to January 2024
- Trades: 3 Stk. couplable arch formwork
- Dimensions:
- Control block length: 14,2m
- Special block length: 28,4m
- Shuttering weight: 2x 160 Tons
- Special features: The arched formwork supplied by RSB was dimensioned in such a way that the two formwork carriages could be coupled together. In addition, in the area of the platform, the entire formwork train had to be able to be used under one-sided concreting, leaving the passage profile free and using special anchoring in the base..