Tunnel

Trimberg

Germany

Tunnel formwork systems

Project details

  • Customer: Arge Tunnel Trimberg (Züblin/Hochtief)
  • Construction time RSB machine: September 2017 – December 2019
  • Dimensions:
    3 track and 2 track tunnel tube (variable)
    Block length L = 10,0 m
  • Special features:
    The RSB machine was designed to form the 2 lane section of the tunnel as well as the 3 lane section. Minimal conversion work results in an optimal cost-benefit factor for the customer.
Tunnel Trimberg Germany

Contact us

Data privacy / DSGVO

5 + 15 =

RSB Formwork Technology

Schilfweg 1 · 6972 Fußach · Austria

n

+43 (0) 5578 7960-400

Subscribe to newsletter