Tunnel
Trimberg
Germany

Project details
- Customer: Arge Tunnel Trimberg (Züblin/Hochtief)
- Construction time RSB machine: September 2017 – December 2019
- Dimensions:
3 track and 2 track tunnel tube (variable)
Block length L = 10,0 m - Special features:
The RSB machine was designed to form the 2 lane section of the tunnel as well as the 3 lane section. Minimal conversion work results in an optimal cost-benefit factor for the customer.

Related projects
Contact us
