Brenner Base Tunnel

Tulfes Pfons

Austria

Tunnel formwork systems

Project details

  • Customer: Arge Brenner Basistunnel (Strabag/Sallini)
  • Construction time RSB: September 2017 – December 2020
  • Dimensions:
    Arched formwork for emergency stops Main tube 15 m span
    Block length L = 12,5m
  • Special features:
    The RSB machine was designed to be able to concrete the emergency stops as well as to be transported through the exit tunnel without major dismantling work.
Brenner Base Tunnel Tulfes Pfons - Austria

Contact us

Data privacy / DSGVO

4 + 12 =

RSB Formwork Technology

Schilfweg 1 · 6972 Fußach · Austria

n

+43 (0) 5578 7960-400

Subscribe to newsletter