Tunnel U2 Vienna Austria
Project details
- Customer: Strabag
- Building owner: Wiener Linien
- Construction time RSB: September 2022 until December 2022
- Trades to be supplied: Full-round formwork
- Dimensions:
- Block length: 10m
- Panel weight: 50 Tons
- Special features: The full-round formwork, produced and delivered by RSB will be assembled on an existing traveler unit. The formwork will be used to pour the standard sections of the new underground metro line. The formwork will be used to pour the standard sections of the new underground metro line.