Oswaldiberg tunnel
Villach
Austria
Project details
- Customer: Strabag AG
- Construction time RSB machine: October 2015 – January 2016
- Dimensions:
Crosscut with D = 3.2 mBlock length = 6.0
-
Special features:
Daily cycle for cross-cutting and transverse transport in the tunnel via low-loader. Special face formwork for connection to the existing tube was designed and supplied by RSB.